Granite Vacancies
Refine your search
Back To Search Results

Vacancy Details

Site Manager

Travel expenses + car allowance + pension + private healthcare
Job Description:

We are currently working closely with our client to source a site manager for one of their flagship projects for 2016 due to commence on site in the next 8 weeks. The project consists of a £20m complex and logistically difficult heavy cut & carve mixed use scheme in the West End of London with a programme length of 18 months. Our client will be remodelling an existing building, to create a theatre, bars and restaurants on the ground floor, with the remained of the building being split between commercial office space and high specification apartments.

The building in question will be going through a series of structural alterations with a single basement excavation, new steel work package to strengthen the existing structure to aid the addition of a new floor on top of the building. There will be a complete internal demolition, movement of the core and high specification office and residential fit out using a range of bespoke and high quality finishes. 

Our client are looking for a site manager with an engineering background, who has worked on difficult cut and carve projects and has experience running temporary works packages. The successful candidate will be operating under a full site team consisting of a senior site manager, senior project manager, quantity surveyor and technical services manager. They will be responsible for all on site operations: management of trade packages and paperwork systems.


Since our clients establishment over 25 years ago they have built up an outstanding reputation as a contractor capable of delivery a range of extremely highs specification new build, heavy cut & carve refurbishments and internal fit out projects across a wide range of sectors. The business has steadily grown over the years at a measured and calculated rate in accordance with their business plans and they amassed a turnover of circa £85m in 2015. Our client pride themselves on building strong and long lasting relationships with all the clients and professional teams they work with creating an excellent reputation in the industry leading to a number of negotiated projects. They have a proved track record of delivering intricate and logistically challenging and stimulating projects in central London and the surrounding areas across the commercial, mixed use, high end residential, change of use and hotel projects.

 Project examples:

·     £17m, two stage D&B – Scope: demolition, double basement excavation, 4 storey concrete frame, internal fit out of 8 very high specification apartments. 18 month programme.

·     £23m, cut & carve refurbishment of an existing Grade II listed building in the centre of London, removal of roof, temporary works, new internal steel work, fit out of luxurious member suites.

·     £11m, new build commercial office in a logistically tight location, commercial fit out, retail units on the ground floor


If you are interested in this job position please feel free to call us on 0207 403 2433 and ask for Kyle Anderson or alternatively fill in the contact form below:

Please fill in all required fields*